The Urbanna Town Council voted on Aug. 27 to spend $110,000 for a temporary Urbanna Town Marina bridge.
The town received three bids for the temporary bridge. Council chose the bid by Faulconer...
Zannino Engineering of Glen Allen bored for soil samples at the Urbanna Town Marina bridge Monday, July 27.
Urbanna Mayor Robbie Wilson III said the...
Urbanna has been awarded a $450,000 federal grant, with no local match required, for preliminary engineering, design, and environmental review activities necessary to repair or...
Council considers temporary span
Building a bridge to the Urbanna Town Marina has been estimated to cost $4.4 million, reported Urbanna Town Administrator Ted...
The 16-foot-long bridge leading to the Town of Urbanna Marina was last inspected by the Virginia Department of Transportation (VDOT) in 2011, said Kelly...