Sewer costs slashed with use of reduced pressure system

MC officials: Hook up to be voluntary

by Tom Chillemi –

A wastewater collection system for Deltaville could cost 40% less if a “low pressure system” is used instead of a “vacuum” system that was originally recommended by the Hampton Roads Sanitation District (HRSD). That’s among the findings of a preliminary engineering report by Timmons Engineering, Middlesex County’s consultants.

Tom Chillemihttps://ssentinel.com
Tom Chillemi is a reporter for the Southside Sentinel.

Stay Connected

6,889FansLike
1,063FollowersFollow
1,743FollowersFollow
101SubscribersSubscribe